!Good to know
Where it applies: El Dorado County's building jurisdiction, such as El Dorado Hills and Cameron Park.
Getting the plans: Download the plan set from the County's website. Details and downloads are on El Dorado County's pre-reviewed ADU page. We'll confirm each point for your lot at the walkthrough.
- No changes to the plans are allowed
- The County stamps the pre-reviewed plan and reviews your site, solar and fire plans
You still need
- A site plan
- Solar (PV) plans to the plan set's PV requirements
- Fire sprinkler plans, if applicable
- The landscape water (MWELO) checklist and Oak Resources compliance certificate
- The County's hold harmless agreement
01Check your lot
Send us your address. We look at setbacks, access, where the sewer and power will run, and which plan fits.
02Site plan and permit
Pre-approved plans don't include your site plan. We coordinate it, the solar and any fire plans, and the permit submittal.
03Written budget
A fixed scope for the building itself, with site work like trenching and utility runs priced from what we see on your lot.
04Build and inspect
Foundation, framing, roof, utilities, insulation, finishes and the required inspections, through final.
Other pre-approved plans we build
Have a lot in El Dorado County? Let's see which plan fits.