The plansPre-reviewed accessory dwelling plans
01661 sq ft
NC ADU_1
One bedroom over a garage. Priced after we review the plan set.
Price After plan review
02746 sq ft
NC ADU_2
Two bedrooms, garage optional.
Starting at $287,000
031,194 sq ft
NC ADU_3
Three bedrooms, garage optional.
Starting at $416,000
Price assumes two bathrooms. The Placer County page doesn't list bath counts, so we'll confirm from the plan set.
04661 sq ft
One bedroom, single story
One bedroom, one bath, no garage.
Starting at $265,000
05749 sq ft
WCH ADU 749
Two bedrooms, one bath, garage optional.
Starting at $288,000
Check the County's page for which plans are current before you buy one.
Get the plans from Placer County ↗Have us check which fits
$What "starting at" covers
Starting prices are for the building itself on a straightforward lot. Every lot is different, so we confirm the real number in a written, line-by-line budget after we walk your property.
- The building, slab to final inspection, on a flat lot with normal access
- Fiber-cement lap siding, comp shingle roof, vinyl windows
- Kitchen with quartz counter and appliances, full bath with tub
- Ductless mini-split and heat-pump water heater
- Sewer and water connections up to 50 ft from the main house
Not included
- The garage on plans where it's optional
- Plan purchase from the plan's owner
- Solar (PV) system and fire sprinklers, if required
- City permit, plan check, impact and school fees
- Title 24 and HERS testing fees
- The underground electrical feed from your main panel (priced after the walkthrough)
- Sewer or water runs over 50 ft, a sewer pump, or an electrical panel upgrade
- Stucco exterior (the plans' other siding option)
- Grading, retaining walls, tree removal and landscaping
!Good to know
Where it applies: Placer County's building jurisdiction. Some nearby cities, like Lincoln, also accept some of these plans.
Getting the plans: Bought from the plan's owner, listed under each plan on the County's page. Details and downloads are on Placer County's pre-reviewed ADU plans page. We'll confirm each point for your lot at the walkthrough.
- No changes are allowed; any change sends the plan through full review
You still need
- A site plan
- Site-specific Title 24 energy calculations and solar (PV) plans
- Fire sprinkler plans and calculations, if required
- A construction waste plan
- An authorization letter from the plan's owner
01Check your lot
Send us your address. We look at setbacks, access, where the sewer and power will run, and which plan fits.
02Site plan and permit
Pre-approved plans don't include your site plan. We coordinate it, the solar and any fire plans, and the permit submittal.
03Written budget
A fixed scope for the building itself, with site work like trenching and utility runs priced from what we see on your lot.
04Build and inspect
Foundation, framing, roof, utilities, insulation, finishes and the required inspections, through final.